Portfolio

Portfolio Portfolio
Cengiz Construction Cengiz Construction

Cengiz Construction

Baku Central Office, Kalbajar, Kalbajar Istisu, Lachin, Dashalti

Cengiz İnşaat Project

As Engitech LLC, we have participated in several key projects of Cengiz İnşaat, implementing productive initiatives to update and enhance their IT infrastructures. Projects undertaken in liberated regions of Baku and Karabakh stand as a testament to the skills of our professional team.

IT Project and Equipment Installation

As a company specializing in the development and management of IT infrastructures, Engitech LLC has carried out the following main tasks within this project:

  • Cable Line Installation: During the initial phase of the projects, precise planning and installation of internal cable (Cat cable) systems were implemented.
  • Server Room Setup: Tasks such as assembling racks, installing and configuring network equipment in server rooms were completed.
  • Server Platforms: The installation of physical servers, RAID system configuration, and the creation of virtual server platforms were successfully completed. Virtual servers were installed in accordance with software and end-user requirements.
  • Firewall Systems: Firewall systems were established as a cornerstone of data security, ensuring compliance with international standards.
  • Wireless Networks: Wireless network systems were installed and configured in an optimized manner.
  • Backup Systems: Backup systems were established and configured to ensure the continuity of IT infrastructures.
  • CCTV Systems: Installation and operational assurance of security cameras were completed.
  • Technical Support: Technical service was provided for the installed equipment, along with continuous support.

Our Role in Karabakh's Reconstruction

In collaboration with Cengiz İnşaat, we have closely supported infrastructure projects in the liberated regions of Karabakh. This contribution extended beyond the renewal of IT infrastructures, also fostering the socio-economic development of the region.

As Engitech LLC, we will continue to actively participate in all processes, from the creation to the utilization of infrastructure. Our company is known for precise planning, professional approaches, and high-quality outcomes.

Shusha Hotel Shusha Hotel

Shusha Hotel

Shusha City

Security Solutions for the Shusha Hotel Project

Project: Installation of CCTV and Alarm System Equipment

Solution:

  • Cable Line Installation: CCTV and alarm system cables were installed within the infrastructure.
  • Termination of CCTV Cables: CCTV cables were professionally terminated, ensuring network stability.
  • CCTV Camera Installation: Security cameras were installed at optimal locations.
  • Alarm System Equipment: Necessary equipment for the alarm system was installed and made operational.
  • Security System Configuration: Security system equipment was installed and configured according to required standards.

Outcome:

Engitech LLC successfully created an impeccable security system for Shusha Hotel, ensuring the efficient utilization of CCTV and alarm systems. The project was completed with satisfaction and handed over for use.

BorusanCat BorusanCat

BorusanCat

Borusan Cat Azerbaijan Project

This project was built on a precise approach to meet the client's security needs and enhance the facility's management processes.

Within the framework of the project implementation, the following technical specifications were fulfilled:

  • Security Cameras: Cameras were installed at strategic locations on the premises for movement and monitoring. These cameras allowed the client to monitor the facility in real-time while providing multifunctional and supportive solutions.
  • Barrier Systems: Barrier systems were installed for vehicle control and automation of entry-exit processes, thereby enhancing the facility's efficiency and security.
  • Switch and Rack Cabinet Installation: The project included the installation of switches and rack cabinets to manage the existing network infrastructure. These components are crucial for centralizing and efficiently managing all devices.
  • Cabling Work: Professional cabling was carried out to ensure precise and stable operation of the security cameras and barrier systems. This process emphasized proper planning and professional installation in the main structure.
  • Access Points: High-speed and reliable access points were installed to strengthen the network infrastructure. This improved data flow within the facility and enhanced communication quality.
  • Card Reader Systems: Card reader systems were installed to automate employee entry-exit processes and ensure safer management. These systems allow for easy monitoring and tracking of staff movements.

All these measures aim to support the operations of Borusan Cat and maximize the facility's security. As Engitech LLC, our goal is always to provide our clients with high-quality and innovative technological solutions.

Merit Brand Merit Brand

Merit Brand

Baku Central office, Shabran, Siyazan

Engitech MMC's Collaboration with the Merit Brand

Project: Complete reconstruction, optimization based on modern technologies, and installation of IT infrastructure for the Merit company.

Solution:
Within the scope of the project, the IT infrastructure of Merit was built from scratch, and the following tasks were accomplished:

  1. Infrastructure Foundation

    • Internal Cable Line Installation: High-quality Cat cables were installed for network connectivity.
    • Server Cabinet Installation: High-quality server cabinets were assembled and optimized at the core of the infrastructure.
  2. Network and Server Technologies

    • Network Equipment Installation and Configuration: Modern switches and routers were installed and optimized to enhance network performance.
    • Physical Server Installation: Powerful physical servers were selected, ensuring high data security with RAID technology.
    • Virtual Server Platform Setup: A modern virtualization platform was established, optimizing servers to meet end-user requirements.
  3. Security Solutions

    • Firewall Installation: A security firewall was installed, adhering to high-security standards to protect data and defend against internal and external threats.
    • Data Security: Special security protocols were implemented to safeguard data.
  4. Wireless Network and Backup Systems

    • Wireless Network (Wi-Fi): A Wi-Fi network covering the entire office area was installed, ensuring maximum performance.
    • Backup Systems: A modern backup system was set up to ensure regular data backup.
  5. Security Systems

    • CCTV System Installation: Surveillance cameras were installed for security purposes and integrated into the system.
    • Centralized Monitoring: All installed security equipment was integrated into a centralized system.
  6. Technical Support

    • Regular technical support was provided for all installed equipment, ensuring long-term and stable system operation.

Project Results:
Engitech MMC successfully modernized Merit's IT infrastructure, optimizing their workflows and elevating security standards. This project demonstrated the proper application of modern technologies, enhancing the company's operational efficiency and creating a solid foundation for long-term growth.

Such successful projects reaffirm Engitech MMC's status as a reliable partner in the field of technology.

Baku Bus Baku Bus

Baku Bus

Baku Bus MMC Tender Project

Engitech MMC is proud to collaborate with Baku Bus MMC, one of Azerbaijan's largest transportation companies. Within the framework of this partnership, the solutions and products offered by our company stood out for their high quality.

Project Objective:
The goal of the project was to supply Baku Bus MMC with office and network equipment, as well as to equip the company with modern technologies.

Solutions Provided:

  1. Office Equipment Supply: High-quality office equipment was provided to optimize Baku Bus MMC's daily operations.
  2. Network Equipment: Reliable and high-performance equipment was delivered for the company's network infrastructure.
  3. Cables and Accessories: Various types of cables and other essential accessories were supplied for infrastructure setup.

Our Advantages:
As Engitech MMC, we have always excelled in tender projects due to the quality and affordability of our products. These strengths were once again demonstrated during our collaboration with Baku Bus MMC. The solutions we proposed fully met the client's needs and added significant value to the company.

Outcome:
Our partnership with Baku Bus MMC reaffirmed Engitech MMC's commitment to high standards in business practices. We remain determined to continue providing quality products and services to our clients in the future.

Cənub Qaz Dəhlizi Cənub Qaz Dəhlizi

Cənub Qaz Dəhlizi

Engitech MMC: Success in the Tender Project for "Southern Gas Corridor" CJSC

Engitech MMC is proud to announce its success in winning the tender of the "Southern Gas Corridor" CJSC, which oversees the management and financing of Azerbaijan's most significant projects. This achievement reflects our commitment to high-quality standards and solutions tailored to client needs.

Project Objective:
The main goal of this project was to meet the office needs of the "Southern Gas Corridor" CJSC and enhance the technological support for its operational processes.

Solutions Provided:

  1. Office Equipment: We supplied high-quality printers and their essential consumables, such as cartridges, to the company. These resources improved the efficiency of their workflow.
  2. Licenses: Licenses for critical software used by the company were provided, ensuring technological stability and security in their work environment.
  3. Other Equipment and Services: Additional supplies required for the daily operations of the "Southern Gas Corridor" CJSC were delivered.

Our Advantages:
Engitech MMC consistently stands out in tender projects due to the quality of its products and services, combined with a competitive pricing strategy. These strengths were evident in our collaboration with the "Southern Gas Corridor" CJSC, resulting in a project completed to the full satisfaction of all parties.

Outcome:
The partnership with the "Southern Gas Corridor" CJSC reaffirmed Engitech MMC's dedication to delivering top-notch services. We are committed to participating in such large-scale projects in the future and achieving continued success.

COP 29 COP 29

COP 29

Bakı

Engitech’s Role in Fire Safety at the 29th Session of the UN Framework Convention on Climate Change Conference of the Parties (COP29)

The 29th session of the UN Framework Convention on Climate Change (COP29) took place this year in Azerbaijan. This significant event, where world leaders, scientists, and experts discussed climate change issues, was successfully held thanks to the significant efforts of our team.

Main Tasks and Objectives

Our primary task for the event was to enhance fire safety during emergencies, promptly detect fire incidents, and provide timely information to the relevant authorities and attendees. Specialized approaches were implemented to minimize damages.

Measures Implemented

  1. Installation of Smoke Detection Devices:Smoke detection devices were installed in the event venues to quickly identify any fire-related incidents and ensure a timely response.
  2. Public Announcement Systems:Public announcement systems were implemented to quickly inform the attendees. This system also played a crucial role in enhancing human safety.
  3. Continuous Monitoring and Supervision:Engitech team members conducted continuous monitoring in shifts, both day and night, throughout the event. This approach ensured the effective operation of systems in case of any emergency.

Outcome

The measures taken by the Engitech team ensured the safe execution of COP29, one of the largest international events. The importance of advanced technologies and a systematic approach to fire safety was once again emphasized. This project allowed Azerbaijan to demonstrate its responsibility as a reliable partner in hosting such high-level international events.

Code Academy Code Academy

Code Academy

Code Academy İT Infrastructure Modernization Project

Engitech MMC has successfully undertaken the responsibility of enhancing Code Academy's IT infrastructure to establish a cutting-edge technological system, delivering professional solutions in the process.

Project Objective:The primary goal of the project was to provide stable power supply, efficient security systems, and innovative technological solutions for Code Academy's IT infrastructure.

Proposed Solutions

The following tasks were completed as part of the project:

  • Planning and Installation of Cable Lines:Internal cable lines (Cat cables) for the infrastructure were meticulously planned and installed to meet high standards.
  • CCTV Network Setup:A dedicated network for CCTV equipment was installed and commissioned.
  • Wireless Network System:A wireless (Wi-Fi) network system was installed and optimized for seamless operation.
  • CCTV System Installation:Security cameras were professionally mounted, and the system was configured to ensure efficient functionality.
  • Power Supply (UPS):A UPS system was installed to provide uninterrupted power supply for IT equipment.
  • Firewall Security:Firewall equipment was implemented to secure the company’s data, ensuring compliance with necessary security protocols.

Outcome:
Through this project, Code Academy gained an innovative IT infrastructure, achieving significant advancements in power supply and security. Engitech MMC takes pride in creating value through professional approaches and effective solutions.

Globus travel Globus travel

Globus travel

Engitech MMC: Innovative Solutions in the Globus Travel Project

Engitech MMC continues to deliver valuable solutions to its clients with a specialized approach in technology and innovation. Within this framework, our company undertook the complete restructuring of Globus Travel's IT infrastructure and successfully established it on a robust recovery platform.

Key Features of the Project

In the project executed for Globus Travel, Engitech MMC carried out the following steps:

  • Virtual Server Platform Development:A virtual server platform was created on the existing physical server infrastructure, accompanied by software provisioning. Virtual servers tailored to end-user requirements were installed and configured.
  • Firewall Security:A firewall was installed to ensure system protection, with additional measures implemented to enhance data security.
  • Backup System:Backup systems were delivered, enabling the consistent preservation of existing data.
  • Technical Maintenance:After project completion, necessary procedures were centralized to provide ongoing technical support for the IT system.

Results

This project significantly expanded the technological capabilities of Globus Travel, thanks to the expert approach provided by our team. The system was stabilized, security was enhanced, and new opportunities were created for the company's operational processes.

At Engitech MMC, we take pride in optimizing our expertise and professionalism to meet the technological needs of our clients.

Navanta Servis Navanta Servis

Navanta Servis

Engitech MMC: Professional CCTV Solutions in the Navanta Servis Project

Engitech MMC, with its specialized technological solutions, has created a professional CCTV system for Navanta Servis and made it ready for use.

Project Objective:The main goal of the project was to establish a perfect CCTV system that would meet the security needs of Navanta Servis.

Provided Solutions:

Within the scope of the project, Engitech MMC carried out the following tasks:

  • Cable Planning and Installation: Necessary cable lines for the CCTV system were planned and installed precisely within cable channels.
  • Cable Termination: CCTV cables were professionally terminated, creating a stable network.
  • CCTV Camera Installation: Security cameras were mounted in optimal locations.
  • Control Equipment: Control equipment for the CCTV system was installed and put into full operation.

Result:

This project has fully met the security needs of Navanta Servis, creating a ready-to-use and stable CCTV system. At Engitech MMC, our commitment is to offer a professional approach to our clients, maintain leadership in technology, and add value to them.

Karasu Operating Company Karasu Operating Company

Karasu Operating Company

Engitech MMC: Professional CCTV Solutions in the Karasu Operating Company Project

Project: Design and installation of the CCTV system and equipment.

Provided Solutions:

  • Cable Installation: CCTV cables were installed with precise planning within the infrastructure.
  • Cable Termination: CCTV cables were professionally terminated, ensuring network stability.
  • CCTV Camera Installation: Security cameras were installed in optimal locations and made ready for use.
  • Control Equipment Installation: Equipment for the full control of the CCTV system was installed, and necessary configurations were made.

Result:

This project has fully met the security requirements of Karasu Operating Company, creating a functional and stable CCTV system. At Engitech MMC, we continue to provide professional technical approaches and high-quality solutions.

Shirvan Operating Company Shirvan Operating Company

Shirvan Operating Company

Shirvan city

Engitech MMC: Professional Solutions in the Shirvan Operating Company Project

At Engitech MMC, we continue to offer innovative technologies to our clients with our specialized knowledge and expertise in the IT sector. The project executed for Shirvan Operating Company is a confirmation of our professional approach and effective solutions.

Project Objective: The main objective of the project was to improve the company's IT infrastructure and establish a stable and efficient network system.

Provided Solutions: Within the scope of this project, Engitech MMC has carried out the following tasks:

  • Cable Planning and Installation:Fiber optic and Cat cable lines were properly planned and installed within cable channels.
  • Cable Termination:Fiber optic and internet cables were terminated according to standards and made ready for use.
  • Server Rooms:Professional racks were assembled in the server rooms.
  • Network Equipment:In the final phase of the project, network equipment was installed and optimally configured.

Result:

This project established a new foundation for Shirvan Operating Company's IT infrastructure, and a stable network system was put into operation. At Engitech MMC, we take pride in combining innovative technologies with a professional approach to add value to our clients.

CBM Engineering CBM Engineering

CBM Engineering

Engitech MMC: Significant Contribution to the CBM Engineering Project

Engitech MMC, one of the leading companies in Azerbaijan's IT sector, has made significant strides in the reconstruction of CBM Engineering's existing IT infrastructure. Our company achieved complex technological solutions in this project, installed sophisticated equipment, and took structural acceleration steps.

Project Aspects

In CBM Engineering's project, our company implemented the following tasks:

  1. Fiber Optic and Internal Cable Systems Installation:
    • Installation of fiber optic and internet cable lines.
    • Expert termination of cables and preparation of connections for use.
  2. Server Room Reconstruction:
    • Planning of server rooms and assembly of rack systems.
    • Installation of optimal equipment and performance testing.
  3. Physical and Virtual Servers:
    • Installation of physical servers and optimization of RAID systems.
    • Creation of a virtual server platform fully adapted to the work environment.
  4. Firewall and Security Solutions:
    • Installation of firewall systems to protect existing infrastructures.
    • Implementation of procedures in accordance with international security standards.
  5. IP Telephony System:
    • Optimization of the company's IP telephony system and enhancement of usability.
  6. Backup System Setup:
    • Creation of a backup system to ensure data continuity.
  7. CCTV System Enhancements:
    • Installation of security cameras and integration into the existing system.
    • Setup of a video conferencing system.

Project Outcomes

The IT infrastructure of CBM Engineering has been fully updated, enabling more efficient execution of existing processes. Ongoing technical service for the installed equipment ensures long-term use of the system.

Engitech MMC continues its mission to support technology and innovation, working on solutions that better meet customer needs.

Real Cleaning Real Cleaning

Real Cleaning

Engitech MMC: Innovative Solutions in the Real Cleaning Project

Engitech MMC continues to offer valuable solutions to its customers with its leading position in the technology sector. The project implemented for Real Cleaning focuses on solving existing issues in their IT infrastructure.

Project Goal:The main goal of the project was to eliminate issues in Real Cleaning’s IT infrastructure and create an excellent technological foundation.

Proposed Solutions:

Engitech MMC implemented the following steps according to the IT needs of Real Cleaning:

  1. Firewall:
    • A progressive firewall system was installed to ensure data security, and security protocols were centralized.
  2. Wireless Network System:
    • The configuration of the wireless network system was completed, improving the company's operational efficiency.
  3. Technical Service:
    • Technical services were provided for existing user equipment and software, stabilizing the system and supporting its agility.

Project Outcome:

As a result of this project, Real Cleaning now has a more stable, secure, and efficient IT infrastructure. This achievement further streamlined and ensured the continuity of the company’s operational processes.

Engitech MMC, as a leading company that offers precise solutions to its customers and focuses on technological innovation and professionalism, approaches technology with expert solutions that meet your goals.

Sundance Azerbaijan Sundance Azerbaijan

Sundance Azerbaijan

Sundance Azerbaijan Project

As a specialized leader in the technology sector, Engitech MMC continues to offer excellent IT solutions to its clients. The project we implemented for Sundance Azerbaijan is an example of our specialized approach and innovative solutions.

Project Goal: The main goal of the project was to create a comprehensive IT infrastructure for Sundance Azerbaijan and make it fully operational.

IT Solutions Implemented by Engitech MMC:

  1. Cable Planning and Installation:
    • Internet cable lines (Cat cable) were professionally laid within cable channels.
  2. Cable Termination:
    • Internet cables were terminated according to standards and made ready for use.
  3. Server Rooms:
    • Server racks were installed in the server rooms.
  4. Network Equipment:
    • Network equipment was installed and configured precisely.
  5. Physical Servers:
    • Physical servers were installed, and RAID systems were configured.
  6. Virtual Server Platform:
    • A virtual server platform was prepared, and servers were installed and configured according to software and end-user requirements.
  7. Firewall:
    • A firewall system was installed, and necessary security protocols were applied to ensure data security.
  8. Wireless Network System:
    • A wireless network system was installed and optimally configured.
  9. IP Telephony System:
    • An IP telephony system was installed and configured according to standards.
  10. CCTV Systems:
    • The installation of CCTV systems was carried out, security cameras were professionally mounted, and the system was made ready for use.

Project Outcome:

This project facilitated the creation of a secure, stable, and efficient IT infrastructure for Sundance Azerbaijan. As Engitech MMC, we continue our work in adapting technological progress to meet the needs of our clients and create value.

Ecosun Ecosun

Ecosun

Engitech MMC: Perfect IT Solution for Ecosun Company

As Engitech MMC, the solution we provided for Ecosun Company was a significant step in the complete overhaul of the company’s IT infrastructure. This project aimed at expanding the company’s technological capabilities, improving data security, and creating a more efficient working environment.

Project Goal:The main objective of the project was to create a modern IT infrastructure for Ecosun, optimize technical support, and ensure a secure data management system.

Implemented Solutions:

  1. Cable Infrastructure Setup:Cat cables were installed within cable channels to ensure the network's stability and reliability. This step allowed multiple devices to connect to the network effectively at the same time.
  2. Cable Termination:Perfect cable termination made the infrastructure more efficient and enhanced the network’s performance.
  3. Server Room Setup:Network racks were installed for server rooms, ensuring proper management of devices.
  4. Network Equipment Installation:Modern network equipment was installed and configured. This not only improved work speed but also created a more stable work environment.
  5. Physical Server Installation:Servers were installed and configured using RAID technology, which allowed for more reliable and efficient data storage.
  6. Virtual Server Platform:A virtual server platform was established to meet Ecosun's needs. Software was applied, and servers were configured according to end-user requirements.
  7. Firewall:A robust firewall system was installed to ensure data security, with necessary protocols applied.
  8. Wireless Network System:A wireless network system was installed and configured to expand the network’s coverage.
  9. IP Telephony:An IP telephony system was set up to expand the company's communication capabilities and configured according to instructions.
  10. Backup System:A reliable backup system was installed to securely store Ecosun's data.

Outcome:

As Engitech MMC, we created an outstanding IT infrastructure for Ecosun Company. These solutions, which met their requirements, added great value to the company’s operations. Ecosun is now able to continue its work with more secure, resilient, and innovative technological capabilities.

Embassy of Algeria Embassy of Algeria

Embassy of Algeria

Algerian Embassy IT Infrastructure Project

As Engitech MMC, we played a key role in the implementation of the IT infrastructure project for the Algerian Embassy located in Azerbaijan.

Project Goal:The main objective of the project was to establish a multifunctional IT system for the embassy, ensuring secure and efficient management of data flow.

Implemented Solutions:

  1. Cable Infrastructure Setup:Cat cables were installed through cable channels to create the internal network of the embassy in a well-structured manner.
  2. Cable Termination:Cables were professionally terminated, maximizing network performance.
  3. Server Room Preparation:Stable and secure rooms were provided for server equipment.
  4. Network Equipment Installation:High-performance network devices were integrated into the system.
  5. Firewall:A robust firewall was installed to ensure data security for the embassy.
  6. Wireless Network System:A wireless network system was seamlessly installed and configured throughout the embassy’s premises.
  7. IP Telephony:An IP telephony system was implemented to ensure proper communication for the embassy.

Outcome:

Engitech MMC provided high-standard solutions for the Algerian Embassy’s technological infrastructure. This project not only optimized the embassy’s workflow but also enhanced security and communication capabilities. Now, the Algerian Embassy operates more efficiently, leveraging the benefits of modern technology.

Companies we supply IT equipment to: